Sanitary Sewer


South Jordan Force Main Project                      $10.1 Million                    South Valley Sewer District

Jordan Force Main-001

 

Construction of two forty-two inch HDPE pipelines, approximately 18,000 feet long.  Included two open-cut river crossings and two bored road crossings, installing air vac valve vaults, eighteen hundred linear feet of forty-eight inch HOBAS gravity sewer line and manholes, and installation of a four inch communications conduit with three one-inch innerducts along the length of the HDPE pipelines.  Restoration of wetlands, golf course, and the Jordan River Trail was required.

READ MORE

 

 

 

 

CWSID Wastewater Treatment Plant Projects                     $20.5 Million                    Central Weber Sewer Improvement District

DSCF1847-1

 

Completion of mass excavation, dewatering and piping for a major sewer plant expansion. The major work on this site included mass excavation of approximately 250,000 CY of existing soils, design-build dewatering system for the entire project site which included installation of 2,500 lf of soil-bentonite slurry wall, construction of new 15 MGD sewer pump station, installation of 2,000 lf of 54″ and 60″ welded steel pipe ,installation of 4,300 lf of 108” RCP sewer outfall piping, 4,600 lf of 18″ to 36″ RCP sewer 20′ to 25′ deep and various misc piping

READ MORE

 

 

West Outfall Relief Sewer Projects                      $12.1 Million                    North Davis Sewer District

1-11-06 Sta 130+02

 

Construction of over 30,000 lf of 36″ 42″ and 48″ gravity sewer lines at 12 to 22 feet deep with a water table of 4 to 6 feet deep out near the Great Salt Lake. Work included bypass pumping, concrete structures, numerous canal/slough crossings and road and field restoration

READ MORE