Wakegan Projects


     Contract Amount: $14.6 Million                     Owner: Brigham City                    Completed in 2009 

DSC00882-1

 

This project consisted of installation of 43,090 linear feet of twenty-four inch, 2,375 linear feet of twenty inch, and 4,630   linear feet of twelve inch ductile iron waterline. Also included in the work scope was the installation of 55,710  linear feet of fourteen and sixteen inch PVC sewer force main, 2,250 linear feet of twenty to thirty inch steel casing bores and 1,200 linear feet of fourteen to twenty-four inch directional drills under the Bear River and Black Slough.  The carrier pipe used for the bores and directional drills was fusible PVC pipe with over 3,400 linear feet installed.