Featured Projects


Cache Water Restoration Project                      $18.9 Million                    Cache County Corporation

IMG_1785

 

8,000 feet of new box culvert was installed on a very narrow shelf on the Logan Canyon hillside . 5,800 feet of 42″ PVC pressure pipeline and approximately 14,000 feet of 6″ to 20″ HDPE pressure piping through Logan City. Significant rock excavation, cast-in-place concrete, rock fall protection, directional drilling, river bypass and dewatering work were also key components to this project.

READ MORE

 

 

 

 

 

Spanish Fork Reach 2 and ULS Valve Station Projects                      $33.2 Million                     Central Utah Water Conservancy District

04-15-10 Nice downstream view of trench pipeline activities from station 194+80 to 205+00.

 

Installation of 2.7 miles of ninety-six inch welded steel water line including road widening and extensive traffic control on US Highway 6, and coordination of equipment, pipe transport, and material delivery to complete the work in very tight spaces. Project also included construction of a dual 96″ and 60″ pigging station structure including 2- 24″ cone valves and 1-42″ cone valve, a 10 acre flushing basin requiring 90,000 cy of excavation Approximately 300 ft of 96″ WSP and 750 ft of 60″ WSP were also installed as part of this project.

READ MORE